Online Standards Store PDF
Design and construction of underground utilities by closed and cut-and-cover methods. With Amendment No. 1
Document status: Active
Correctional institutions and centers of criminaly-executive system. Design rules
Document status: Active
Aerodromes. Geotechnical monitoring during operation
Document status: Active
Main (trunk) pipelines. With Amendments No. 1, 2
Document status: Replaced by SP 86.13330.2022
Topographical survey for construction. Part II. Performing survey of underground facilities at topographical surveys for construction
Document status: Active
House-to-house heat supply systems on the basis of individual gas heat generators. Rules for design and arrangement. With Amendment No. 1
Document status: Replaced by SP 282.1325800.2023