Online Standards Store PDF
Railway and highway tunnels
Document status: Replaced by SHNK 2.05.05-24
Designing of prefabricated, cast-in-place and cast-in-situ reinforced concrete structures
Document status: Active
Norms of allotment of land for water mains and sewage collectors
Document status: Replaced by SHNK 2.10.01-23
Norms of allotment of land for electric networks of voltage 0,4-750 kV
Document status: Replaced by SHNK 2.10.01-23
Geotechnical designing. Part. Basis for geotechnical designing
Document status: Active
Perfomance and acceptance of works on construction of collector tunnels in cities and in industrial enterprises constructed by shield driving method
Document status: Replaced by QR 06.07-23