Online Standards Store
Designing of off-site systems of the water supply and water disposal systems to SNiP RK 4.01-02-2009 'Water supply. External systems and structures' and SN RK 4.01-03-2011 'Water disposal. External systems and structures'
Document status: Active
Hydraulic engineering river and water storage basin transport constructions
Document status: Replaced by QR 07.02-23
Buildings and constructions on collapsible and anthropogenic soils
Document status: Active
Instructions for design of process steel pipelines with Pn up to 10 MPa
Document status: Replaced by SHNK 2.04.10-22
Designing of concrete and reinforced concrete structures made of heavy weight concrete without prestressing of reinforcement
Document status: Active
Dams from unpaved materials. With Amendment No.1
Document status: Replaced by SHNK 2.06.05-21