STB PDF
Planning, design, setting up and use of temporary suspended access equipment. Code of practice. Original standard BS 5974-2017 in PDF full version. Additional info + preview on request
Document status: Active
Temporary works - Management procedures for the control of temporary works. Code of practice. Original standard BS 5975-1-2024 in PDF full version. Additional info + preview on request
Document status: Active
Lintels - Method for assessment of load. Original standard BS 5977-1-1981 (2010) in PDF full version. Additional info + preview on request
Document status: Active
Lintels - Specification for prefabricated lintels. Original standard BS 5977-2-1983 (1999) in PDF full version. Additional info + preview on request
Document status: Withdrawn
Remote centres receiving signals from fire and security systems. Code of practice. Original standard BS 5979-2007 in PDF full version. Additional info + preview on request
Document status: Replaced by
Sampling and examination of bituminous mixtures for roads and other paved areas - Methods for the measurement of the rate of spread of coated chippings and the temperature of bituminous mixtures using non-contact temperature-measuring devices and for the assessment of the compaction performance of a roller. Original standard BS 598-1-2011 in PDF full version. Additional info + preview on request
Document status: Replaced by STB BS 594987-2024