STB PDF

↑
STB BS 5974-2017

Planning, design, setting up and use of temporary suspended access equipment. Code of practice. Original standard BS 5974-2017 in PDF full version. Additional info + preview on request

Document status: Active

€50
STB BS 5975-1-2024

Temporary works - Management procedures for the control of temporary works. Code of practice. Original standard BS 5975-1-2024 in PDF full version. Additional info + preview on request

Document status: Active

€50
STB BS 5977-1-1981 (2010)

Lintels - Method for assessment of load. Original standard BS 5977-1-1981 (2010) in PDF full version. Additional info + preview on request

Document status: Active

€50
STB BS 5977-2-1983 (1999)

Lintels - Specification for prefabricated lintels. Original standard BS 5977-2-1983 (1999) in PDF full version. Additional info + preview on request

Document status: Withdrawn

€50
STB BS 5979-2007

Remote centres receiving signals from fire and security systems. Code of practice. Original standard BS 5979-2007 in PDF full version. Additional info + preview on request

Document status: Replaced by

€50
STB BS 598-1-2011

Sampling and examination of bituminous mixtures for roads and other paved areas - Methods for the measurement of the rate of spread of coated chippings and the temperature of bituminous mixtures using non-contact temperature-measuring devices and for the assessment of the compaction performance of a roller. Original standard BS 598-1-2011 in PDF full version. Additional info + preview on request

Document status: Replaced by STB BS 594987-2024

€50
↑