Online Standards Store PDF
Perfomance and acceptance of works on construction of collector tunnels in cities and in industrial enterprises constructed by shield driving method
Document status: Replaced by QR 06.07-23
Sewage. External systems and structures. With Amendment
Document status: Active
Action on load-bearing structures. Part 1-7. General actions. Accidental exposures
Document status: Active
Irrigation systems. Design standards
Document status: Replaced by SHNK 2.06.03-12
Designing of steel and concrete structures. Part. Tube-concrete structures
Document status: Active