Online Standards Store PDF
Instruction about the order of development, coordination, expertise and approval of urban planning documentation
Document status: Active
Railways with 1520 mm track. With Amendment No. 1
Document status: Replaced by SP 119.13330.2024
Correctional institutions and centers of criminaly-executive system. Design rules
Document status: Active
Buildings of educational institutions of high education. Design rules
Document status: Active
Roads in eternal permafrost regions. Rules of design and construction. With Amendment No. 1
Document status: Active
Metal spatial structures of roofs. Design requirements
Document status: Active