GOST 27807-88 PDF
Name in English:
GOST 27807-88
Name in Russian:
ГОСТ 27807-88
Vertical hydraulic turbines. Technical requirements and rules of acceptance
Full title and description
GOST 27807-88 — Vertical hydraulic turbines. Technical requirements and rules of acceptance. Specifies technical requirements, inspection and acceptance procedures for vertical hydraulic reaction turbines (adjustable-blade axial and radial-axial types) intended to drive hydro-generators.
Abstract
This standard establishes mandatory technical requirements and acceptance rules for vertical hydraulic reaction turbines of two systems (adjustable-pitch axial — Kaplan-type — and radial-axial) referenced to the dimensional and hydraulic parameters of GOST 27528-87. It covers criteria for design-related characteristics, factory testing, documentation and acceptance procedures required before turbines are delivered for installation on hydroelectric generator units.
General information
- Status: Active / in force (information current as of February 27, 2026).
- Publication date: Issued 1988; put into effect 1 January 1989.
- Publisher: State Committee for Standards of the USSR (Gosstandart); originally published by the Publishing House of Standards (Издательство стандартов).
- ICS / categories: 27.140 — Hydropower engineering (hydraulic turbines).
- Edition / version: First edition — designation “-88” (approved 23 August 1988).
- Number of pages: 5 pages.
Scope
Applies to vertical hydraulic reaction turbines of two systems — adjustable-pitch axial (pivot-blade, commonly Kaplan-type) and radial-axial — manufactured for driving hydro-generators. The standard sets out the essential technical requirements, acceptance testing and documentation that manufacturers and buyers must follow for factory acceptance and delivery of turbine units.
Key topics and requirements
- Definitions and classification of vertical reaction turbines covered (axial adjustable-blade and radial-axial systems).
- Technical requirements for hydraulic, mechanical and dimensional characteristics referenced to GOST 27528-87.
- Factory acceptance procedures, including required tests and test-run conditions (performance, vibration, clearances, balancing and sealing checks).
- Quality assurance and documentation to accompany delivered turbines (test reports, material certificates, dimensional checks).
- Acceptance criteria and permissible deviations for key parameters (efficiency, rotational speed, allowable vibration and leakage limits).
- Responsibilities of manufacturer and purchaser during inspection and acceptance operations.
Typical use and users
Used by turbine manufacturers, design offices and engineering contractors, hydroelectric plant owners and maintenance teams, factory and independent testing laboratories, procurement and quality assurance departments, and national/regional conformity bodies involved in commissioning hydro-generator units.
Related standards
Directly related to GOST 27528-87 (Vertical hydraulic reaction turbines — types and basic parameters). Other related energy and power-generation standards (concerning testing, documentation and performance requirements for power equipment) may be used in conjunction with GOST 27807-88 when specifying or accepting turbine-generator assemblies.
Keywords
GOST 27807-88; vertical hydraulic turbines; Kaplan; axial-flow turbine; radial-axial turbine; technical requirements; acceptance; factory tests; hydrogenerator drive; GOST 27528-87.
FAQ
Q: What is this standard?
A: GOST 27807-88 is a Soviet-era (observed and maintained in national catalogs) standard that specifies technical requirements and acceptance rules for vertical hydraulic reaction turbines used to drive hydro-generators.
Q: What does it cover?
A: It covers the scope of turbine types (adjustable-pitch axial and radial-axial), key technical and hydraulic requirements, factory acceptance tests, documentation and criteria for accepting turbine units prior to delivery.
Q: Who typically uses it?
A: Manufacturers of hydraulic turbines, hydroelectric plant engineers and owners, testing laboratories, procurement and QA teams, and regulatory or inspection bodies responsible for turbine acceptance.
Q: Is it current or superseded?
A: According to standards catalogs and databases, GOST 27807-88 is listed as in force. The status noted here is current as of February 27, 2026. Users should verify the legal/applicability status in their country or in the national standards registry before quoting the standard for procurement or regulatory purposes.
Q: Is it part of a series?
A: It is part of the set of energy/hydropower GOSTs and is linked to GOST 27528-87 (types and main parameters for vertical hydraulic reaction turbines). Other related GOSTs address broader power-station and equipment requirements and may be used alongside this standard.
Q: What are the key keywords?
A: Vertical hydraulic turbines; Kaplan; axial-flow; radial-axial; technical requirements; acceptance tests; factory acceptance; hydrogenerator.