Laying utility lines using horizontal directional drilling
Document status: Active
Timeframe rates for construction and pre-construction work in construction of enterprises, buildings and structures. Part I (amd. 06.11.2019 - 178-NK)
Document status: Active
Timeframe rates for construction and pre-construction work in construction of enterprises, buildings and structures. Part II (amd. 01.08.2018 - 171-NK)
Document status: Active
Geodetic works in construction (amd. 06.11.2019 - 178-NK)
Document status: Active
Installation and operation of crane ways for building tower cranes
Document status: Active
Designing of electric lighting for construction sites.
Document status: Active