Reliability in technics. Inspection methods of reliability indexes and plans of check tests on reliability
Document status: Withdrawn
Water-tube boilers and auxiliary installations. Part 5. Workmanship and construction of pressure parts of the boiler
Document status: Active
Radioelectronic, electronic and electrotechnical. Conventional functional designations
Document status: Active
Metal bellows expansion joints and seals. General specifications
Document status: Active
Reinforced concrete non-pressure pipes. Specifications
Document status: Replaced by GOST 6482-2011
Starting equipment for discharge lamps. General technical requirements
Document status: Withdrawn