Requirements to the report on justification of safety of radioactive wastes storage buildings in part of outer impacts account
Document status: Active
Requirements to full-scope simulators for use in training of operators of nuclear power plant unit control room
Document status: Active
Design rules of emergency power supply systems of nuclear power plants
Document status: Replaced by NP 087-11
General provisions for design and operation of emergency power supply systems of nuclear power plants
Document status: Replaced by NP 087-11
Uniform control methods for basic materials (semi-finished materials), welded joints and weldings on of equipment and pipelines of nuclear power plants. Ultrasonic testing. Part III. Thickness measurement of monometals, metals and corrosion resistant coatings
Document status: Replaced by GOST R 50.05.03-2018
Uniform control methods for basic materials (semi-finished materials), welded joints and welding on of equipment and pipelines of nuclear power plants. Ultrasonic testing. Part II. Weld examination
Document status: Replaced by GOST R 50.05.02-2018