Online Standards Store
General purpose oil-immersed power transformers. Permissible loads
Document status: Active
Hydro power plants. Part 3-1. Hydraulic turbines. Procurement specification
Document status: Replaced by GOST R 55260.3.1-2020
Design and installation of electrical installations of coal mines and underground workings
Document status: Active
Hard magnetic sintered materials on basis neodymium-iron-boron alloys. Classification. Main parameters
Document status: Active
Surge protective devices connected to low-voltage power distribution systems. Part 1. Performance requirements and testing methods
Document status: Replaced by GOST R 51992-2011
Ring cable terminals with close tail, attached to conductor core. Construction and sizes
Document status: Active