Turkmenistan standards PDF
Hazard and operability studies (HAZOP studies) - Application guide. Original standard AS IEC 61882-2003 (2013) in PDF full version. Additional info + preview on request
Document status: Replaced by St AS IEC 61882-2017
Hazard and operability studies (HAZOP studies) — Application guide. Original standard AS IEC 61882-2017 in PDF full version. Additional info + preview on request
Document status: Active
Uninterruptible power systems (UPS), Part 3: Method of specifying the performance and test requirements. Original standard AS IEC 62040.3-2012 in PDF full version. Additional info + preview on request
Document status: Active
Electricity metering equipment (a.c.) — Particular requirements, Part 31: Pulse output devices for electromechanical and electronic meters (two wires only). Original standard AS IEC 62053.31-2018 in PDF full version. Additional info + preview on request
Document status: Active
Electricity metering equipment — Particular requirements, Part 41: Static meters for DC energy (classes 0.5 and 1). Original standard AS IEC 62053.41-2023 in PDF full version. Additional info + preview on request
Document status: Active
Guidance on the measurement of wettability of insulator surfaces. Original standard AS IEC 62073-2005 in PDF full version. Additional info + preview on request
Document status: Replaced by St SA TS IEC 62073-2020